Can you add a battery to the solar panels already on your building? Often, yes. A commercial battery storage retrofit starts with deciding what you want the battery to do. Keeping refrigeration running during an outage calls for a different design than lowering your facility’s peak electricity demand.


Start with the job you want the battery to do

A battery energy storage system (BESS) can store surplus solar power for later use, supply selected equipment during an outage, or reduce demand charges by discharging when your facility draws the most power from the grid. It can also help manage short peaks from new loads such as EV chargers.

The value depends on when you use electricity, how your utility bills for demand and credits exports, and how much energy you want to reserve for backup.


AC-coupled or DC-coupled?

AC coupling adds a battery inverter on the building’s AC side. It can often work alongside your existing solar inverters, making it a practical starting point for a retrofit.

DC coupling connects the solar array and battery on the DC side, typically through a shared inverter. It can reduce conversion losses when solar charges the battery directly. Depending on your equipment, it may also require changes to the existing inverter or solar wiring. Compare equipment compatibility, warranty implications and installation cost before choosing.


Design backup around critical loads

Backup requires equipment and controls that safely isolate the backed-up circuits from the grid. List the equipment that must keep running, the power it needs to start and operate, and how long you want it to run. Common examples include refrigeration, network equipment, security systems and heating controls.

If you want your existing solar array to recharge the battery during an outage, confirm that the solar inverters, battery inverter and backup controls can work together while isolated from the grid. BC Hydro guidance on self-generation and outages


Plan for winter, siting and approvals

Check the manufacturer’s charging and operating temperature limits against your site’s winter conditions. An outdoor system may need a temperature-controlled enclosure. Include the energy used by heating and cooling in your performance estimate.

Review equipment clearances, service access, and applicable electrical, building and fire requirements early. Confirm permits and inspections with the local authority. Ask your utility or wires provider whether adding storage changes your existing interconnection approval, including if you plan to limit battery exports. BC Hydro battery storage guide · ENMAX interconnection standards


Size the battery with your site data

Start with 12 months of electricity bills and, where available, interval data such as 15-minute readings. Add your solar production records and a list of critical loads.

Kilowatts (kW) tell you how much power the battery can supply at once. Kilowatt-hours (kWh) tell you how much energy it can deliver over time. A facility with short demand spikes may need substantial power for only a brief period. A facility that needs to keep equipment running for several hours may need more energy capacity. Model both against your electricity rate and backup needs to compare costs, expected savings and runtime.


Check incentives before committing

Qualifying stationary storage equipment may be eligible for the federal Clean Technology Investment Tax Credit. Some utilities, including BC Hydro, offer incentives for eligible projects. Confirm equipment, ownership and pre-approval requirements before including an incentive in your budget. Natural Resources Canada eligibility guidance · BC Hydro rebate requirements


How Aurion Renewables can help

Aurion Renewables can help you assess retrofit options and carry the design through equipment integration, construction and commissioning. Tell us about your existing solar system and what you want storage to do. Contact Aurion’s engineering team